The Blackwater Project is located in British Columbia, Canada, 160 kilometres southwest of Prince George. The project is accessible from an existing Forestry Service Road.
The mine site would include an open pit, ore processing facilities, a tailings storage facility, waste rock dumps, water management facilities, offices, accommodation camps, warehouses, and a truck shop. A 140 kilometre transmission line would connect the mine site with an existing substation south of Endako.